About Us

Projects & Clients

Excellence Through Service

Our clients consist of the general public, the private sector, government agencies, lawyers, developers, contractors, architects, and engineers. Clients past and present include:

ADI
AV Nackawic Inc
Bell Aliant
City of Fredericton
Colpitts Developments Ltd
Department of National Defense
Department of Supply & Services
Department of Transportation
Enbridge Gas New Brunswick
J D Irving Ltd

Jacques Whitford
Killam Investments
MMH Prestige Homes
NB Power
Natural Resources Canada
Neill & Gunter
SmartCentres
The Hanson Group of Companies
Town of Oromocto
University of New Brunswick

Projects we have contributed to (past and present) include:

  • Route 95 from the TCH at Woodstock to the US border at Houlton, Maine
  • Fredericton North Sports & Leisure Complex
  • SmartCentres development on Two Nations Crossing in Fredericton
  • Pokiok to Longs Creek section of the four lane highway
  • Marysville Bypass on Route 8
  • Fredericton to Coles Island section of the four lane highway
  • Condominium projects for Colpitts Developments Ltd and Capital City Condominiums
  • Fixed link between New Brunswick and Prince Edward Island
  • Value Village in Fredericton
  • Fredericton Mall (changing from mall to box stores)

Sample Projects:

DOT - Route 1 St Stephen section

  • Set control
  • Conducted centreline profile and cross sections

DOT - Route 1 St Andrews section

  • Set control
  • Centreline and topographic survey

DOT - Route 95 from the Trans Canada Highway at Woodstock, NB to the US Border at Houlton, ME

  • Established control prior to field measurements
  • Conducted field ties to existing pavement and other features within right-of-way limits
  • Conducted quality control checks and reduced raw data collected by Geodimeter Total Station
  • Provided data in electronic format for use by the Department of Transportation

CFB Gagetown - Topographic Survey of several individual sites over large area

  • Established GPS control over an approximate 50 km perimeter prior to field measurements
  • Conducted field measurements for topographic survey on approximately a dozen sites (ranging from open area to heavily wooded areas)
  • Prepared AutoCad drawings for use by Defence Construction Limited and various other professionals for design build projects

MRDC - Fredericton to Moncton four lane Trans Canada Highway (from Fredericton to Coles Island)

  • Conducted Static GPS observations for photo control points related to mapping prior to the project
  • Conducted centreline profile and cross sections for approximately 20 kilometres using GPS and Total Station
  • Conducted topographic surveys for existing highways crossing the proposed route using GPS and Total Station
  • Conducted topographic surveys of various streams crossing the proposed route using GPS and Total Station
  • Conducted as built surveys of the constructed highway for approximately 20 kilometres using GPS
  • Established layout control using GPS
  • Reduced all data and conducted quality control checks
  • Prepared AutoCad drawings for some of the topographic surveys

Commited to our Community

Trainor Surveys (1974) Ltd is a proud sponsor of many local community organizations and events. To see us in action view our Community Involvement section.

Learn more