Projects & Clients
Excellence Through Service
Our clients consist of the general public, the private sector, government agencies, lawyers, developers, contractors, architects, and engineers. Clients past and present include:
ADI
AV Nackawic Inc
Bell Aliant
City of Fredericton
Colpitts Developments Ltd
Department of National Defense
Department of Supply & Services
Department of Transportation
Enbridge Gas New Brunswick
J D Irving Ltd
Jacques Whitford
Killam Investments
MMH Prestige Homes
NB Power
Natural Resources Canada
Neill & Gunter
SmartCentres
The Hanson Group of Companies
Town of Oromocto
University of New Brunswick
Projects we have contributed to (past and present) include:
- Route 95 from the TCH at Woodstock to the US border at Houlton, Maine
- Fredericton North Sports & Leisure Complex
- SmartCentres development on Two Nations Crossing in Fredericton
- Pokiok to Longs Creek section of the four lane highway
- Marysville Bypass on Route 8
- Fredericton to Coles Island section of the four lane highway
- Condominium projects for Colpitts Developments Ltd and Capital City Condominiums
- Fixed link between New Brunswick and Prince Edward Island
- Value Village in Fredericton
- Fredericton Mall (changing from mall to box stores)
Sample Projects:
DOT - Route 95 from the Trans Canada Highway at Woodstock, NB to the US Border at Houlton, ME
- Established control prior to field measurements
- Conducted field ties to existing pavement and other features within right-of-way limits
- Conducted quality control checks and reduced raw data collected by Geodimeter Total Station
- Provided data in electronic format for use by the Department of Transportation
CFB Gagetown - Topographic Survey of several individual sites over large area
- Established GPS control over an approximate 50 km perimeter prior to field measurements
- Conducted field measurements for topographic survey on approximately a dozen sites (ranging from open area to heavily wooded areas)
- A combination of GPS and Total Station was used to successfully complete the topographic surveys
- Reduced all data and conducted quality control checks
- Prepared AutoCad drawings for use by Defence Construction Limited and various other professionals for design build projects
- Delivered all data in hard copy and electronic format
MRDC - Fredericton to Moncton four lane highway
- Involved with the area from Fredericton to beyond Coles Island
- Conducted Static GPS observations for photo control points related to mapping prior to the project
- Conducted centreline profile and cross sections for approximately 20 kilometres using GPS and Total Station
- Conducted topographic surveys for existing highways crossing the proposed route using GPS and Total Station
- Conducted topographic surveys of various streams crossing the proposed route using GPS and Total Station
- Conducted as built surveys of the constructed highway for approximately 20 kilometres using GPS
- Established layout control using GPS
- Reduced all data and conducted quality control checks
- Delivered all data in electronic format
- Prepared AutoCad drawings for some of the topographic surveys
Commited to our Community
Trainor Surveys (1974) Ltd is a proud sponsor of many local community organizations and events. To see us in action view our Community Involvement section.
Learn more







